How Concrete Coating Works

Residential and Commercial Concrete Coating Services

How it works

TIME: 10AM

STEP 1: PREPARATION & GRINDING

We start by diamond grinding the concrete base. Dust is minimized by having all grinders hooked up to vacuum systems.

Spotted Line
Meticulous about every detail

STEP 2: CONCRETE RESTORATION

Menders and Fillers are used to fix all of the pits and cracks before the process begins.
Curvy Line

The Foundation

STEP 3: BASE COAT & CHIP

Our 100% solids, self-priming pure Polyurea basecoat is mixed and applied. Immediately after the basecoat application, the chip is generously broadcast by hand, providing both color and texture to the floor.

Spotted Line

Needs to Cure

STEP 4: SET UP TIME

Setup times are typically within one (1) hour after application.

Curvy Line
scraping paint chip flake off epoxy floor during installation

STEP 5: SCRAPING

Once the basecoat is fully cured, we spread the flakes. The floor is then scraped and vacuumed to remove any loose or vertical standing flakes.

Spotted Line

Each step is the difference with our floors

STEP 6: TOP COAT

The final step is to spread and roll out the UV stable Polyaspartic clear coat.

Top Coating Concrete